Mount the copper charging copper plates at the exact parking positions at the top and bottom of the rail.
Secure the brackets to the stairs using the provided heavy-duty wood lag screws or concrete anchors. Do not fully tighten them yet; leave room for minor adjustments. Step 4: Loading the Carriage onto the Rail
Wipe down the aluminum rail track with a dry, lint-free cloth to remove dust and debris. Do not apply heavy grease to the rack. thyssenkrupp levant stair lift installation manual full
Common issues identified in the JustAnswer Technical Guide and user manuals: User manual ThyssenKrupp Levant (English - 25 pages)
Before diving into the installation process, it's essential to ensure that you've met the pre-installation requirements. These include: Mount the copper charging copper plates at the
Height-adjustable brackets that clamp to the rail and screw into the stairs.
The main motorized chassis that rides along the rail. Step 4: Loading the Carriage onto the Rail
: Fit the chair base onto the drive unit and secure the seat assembly. Electrical Setup
Pull the electrical wiring through the rail during assembly to connect charging points.
Place the rail on the stairs, typically keeping a small gap (approx. 10-15mm) between the rail and the baseboard.
Q: What is the power supply requirement for the ThyssenKrupp Levant stair lift? A: The ThyssenKrupp Levant stair lift requires a 24V DC power supply.