: Use certified concrete blocks when ground staking is impossible.
Drive steel stakes into the ground through the footplates. According to EN 13782, stakes must typically be driven at an angle away from the tent (usually 15 to 45 degrees) to maximize pull-out resistance.
Following manufacturer instructions on anchoring, wind speed limits, and assembly. en 13782 pdf install
| | EN 13782 | EN 1991 (Eurocode 1) | | :--- | :--- | :--- | | Structure Type | Temporary / modular halls | Permanent buildings | | Standard Type | Product & usage safety standard | Structural load calculation code | | Usage Duration | Short to medium term | Long term (20+ years) | | Includes Disassembly & Relocation | Yes | No | | Compliance Pathway | Quick, scenario-based approval | Part of full building permit process |
: Every installation must be provided with a suitable quantity of ballast or anchoring as specified in the product certificates to resist wind loads. : Use certified concrete blocks when ground staking
Installation does not end once the tent is erected. Continuous monitoring is required to maintain compliance.
The installation must strictly follow the manufacturer's manual. Alterations to the assembly sequence can compromise the stability of the frame during erection. Frame Assembly Continuous monitoring is required to maintain compliance
What type of (e.g., concrete, asphalt, soil, sand) will you be anchoring into?
The PDF clearly states: “Installation shall be carried out by trained personnel under the supervision of a competent person.” This means:
: Check all aluminum extrusions and steel joints for cracks.