Drgem X Ray Service Manual Install File
The floor must support a minimum weight density of 500 kg/m² for fixed systems.
What is the specific (e.g., GXR-32S, GXR-52S, Diamant)?
Check charger and energy storage modules (for GXR-C32/C40).
Attach the manual or automatic collimator to the tube port flange, ensuring the internal mirror is clean and undamaged. drgem x ray service manual install
Level the table chassis by adjusting the foot leveling screws. Secure the chassis to the concrete floor. Release the shipping tie-downs on the floating tabletop.
Mechanical assembly must follow a precise sequence to prevent structural imbalances or damage to sensitive components. Step 1: Installing the Floor Rails or Ceiling Suspension
A dedicated, low-resistance earth ground (< 0.1 ohms) is mandatory to eliminate electrical noise and prevent shock hazards. The floor must support a minimum weight density
Apply a thin, uniform layer of high-vacuum silicone grease to the rubber terminal plugs. This prevents air gaps and electrical arcing.
Check network settings on the workstation PC. Verify links using "ping" commands. Check cable continuity.
Establish a low-resistance ground connection (typically less than 1 Ohm). Proper grounding is critical to eliminate electrical noise in the digital detectors and ensure patient safety. Attach the manual or automatic collimator to the
A: Request a replacement from DRGEM technical support (provide your service contract number). Unauthorized copies are watermarked and will trigger a security lockout.
Mount the collimator to the tube head, ensuring correct alignment with the center of the image receptor. B. Electrical Connections
Mark the center lines for the X-ray tube stand based on the room layout diagram.
Crucial: Secure the earth cable to prevent electrical shock. Emergency Switch: Assemble the emergency stop switch. Assemble the Tube Cover: Secure the housing covers.